I've been preparing to take the InterSystems HL7 Interface Specialist certificate and on the page that explains the cert it lists one in-person class and one online course. I've been through the suggested online course but when I read through the practice questions there are a lot of things that aren't covered or mentioned in that course. Naturally I could go digging through the documentation but there is no specific guidance about what things to study.

1 6
1 219

I am fairly new to using Docker, and instead of trying to get IIS, a Web Gateway, and Docker desktop working within my Windows environment, I thought I would try running it in a WSL2 Ubuntu environment since this is similar to how use it on my server. I have installed Apache and the Web Gateway on my WSL2 Ubuntu.

0 1
0 181

Given the number of new features in this release, InterSystems has decided to add this fifth preview as part of the 2024.1 developer preview program. This extended developer preview release only includes InterSystems IRIS® for HealthTM, and HealthShare® Health Connect.

❗This announcement does not apply for InterSystems IRIS®

1 1
0 122

I had a question about using ZSTART, ZSTOP, and ZMIRROR.

  • If we use them and it is not correct, does it mess up with any of the existing functionality?
  • So, if I create a ZSTART with a simple command of starting the %JDBC Server will that mess up anything existing in the Startup sequence?
  • Is ZSTART, ZSTOP, and ZMIRROR just an extension of the existing functionality, or does it alter how the built in functionality runs?
  • Should we tread lightly in the use of them?
2 7
1 297

InterSystems announces its fourth preview, as part of the developer preview program for the 2024.1 release. This release will include InterSystems IRIS®, InterSystems IRIS® for HealthTM, and HealthShare® Health Connect.

1 2
0 267

Hi All! We have a new online course that those of you who do integration work / create data transformations may be interested in: Editing Data Transformations via Code. This course is meant to build familiarity with the code behind data transformations in InterSystems products, enabling you to identify their class structures, logical elements, and more.

2 0
0 109

Our 3M Computer Assisted Coding system goes down on a regular basis for updates, the Applications folks like us to Disable the Business Operations when this happens and start them back up when they page the on-call person. The Business Operations have to be started in a sequence to guarantee that all the ADT being sent it processed before we start sending everything else.

0 0
0 148

InterSystems announces its second preview, as part of the developer preview program for the 2024.1 release. This release will include InterSystems IRIS®, InterSystems IRIS® for HealthTM, and HealthShare® Health Connect.

5 9
0 469

Has anyone noticed that when IRIS is forced down that the EnsLib.JavaGateway.Services do not properly shut down and release the ports? While we can write a shell script to kill the processes at the OS level, I was wondering if anyone experienced this issue.

We are working on our Mirroring setup/failover and had the team testing forcing the Primary down to make the Backup to become the Primary Server. When this happened and we failed back, IRIS could not restart the JavaGateway.Services because the ports were still in use.

0 0
0 139

Hello,

I am trying to connect to a web socket endpoint that potentially has a number of different IP addresses for load balancing purposes.

I have been asked whether it's possible to use a DNS name to resolve the IP address rather than statically assigning one specific IP address in the TCP Operation.

If it's not possible to resolve on a DNS name directly on the TCP operation, then I wondered whether it was possible to provide multiple IP addresses.

0 2
0 161

InterSystems announces its third preview, as part of the developer preview program for the 2024.1 release. This release will include InterSystems IRIS®, InterSystems IRIS® for HealthTM, and HealthShare® Health Connect.

1 0
0 172

We resume our series of articles on the FHIR Adapter tool available to HealthShare HealthConnect and InterSystems IRIS users.

In the previous articles we have presented the small application on which we set up our workshop and showed the architecture deployed in our IRIS instance after installing the FHIR Adapter. In today's article we will see an example of how we can perform one of the most common CRUD (Create - Read - Update - Delete) operations, the reading operation, and we will do it by recovering a Resource.

6 3
5 517
Question
· Dec 14, 2023
LDAP Logging

I am trying to troubleshoot an issue with LDAP and a specific user. Besides what is in the Audit Database is there another way to look to see the LDAP functionality that is being called and the response, like there is with OAuth and the ISCLOG? The Audit Log is returning a failure (Unexpected - /api/atelier login failure | InterSystems Developer Community) for this particular user, and I want to get proof that it might be something with the LDAP and not IRIS.

Thanks

Scott

0 6
0 351
Article
· Feb 1, 2024 2m read
Mind map your FHIR patient data

According Wikipedia a mind map is a diagram used to visually organize information into a hierarchy, showing relationships among pieces of the whole. It is often created around a single concept, drawn as an image in the center of a blank page, to which associated representations of ideas such as images, words and parts of words are added. Major ideas are connected directly to the central concept, and other ideas branch out from those major ideas.

2 6
0 235

Sometimes we need to convert FHIR message to HL7 V2, e.g. to register a patient to the PACS system.
In this article, I will explain the steps to achieve the desired by using IRIS FHIR Server production.

Below are the steps we need to follow:

  1. Make sure FHIRServer production is started.
  2. Register Business Service with FHIRServer endpoint.
  3. Define Business Processes to convert FHIR message to SDA and then Convert SDA to HL7 v2.
  4. Post JSON resource to FHIRServer endpoint and get HL7 V2 response.

Let's review the steps in detail.

Step 1. Make sure FHIRServer production is started

Open the production page and make sure Production is started. In the next step, we need to make sure business service HS.FHIRServer.Interop.Service is registered with FHIRServer

1 0
0 406
InterSystems Official
· Nov 29, 2023
Introducing the Upgrade Impact Checklist

We are excited to announce a new part of InterSystems documentation that makes it easier to upgrade InterSystems IRIS® data platform, InterSystems IRIS® for Health™, or HealthShare® Health Connect. The Upgrade Impact Checklist at https://docs.intersystems.com/upgrade shows you all the things you need to consider – and only the things you need to consider – in an upgrade between any two versions.

18 8
3 569

Hi Developers,

We have exciting news! The new InterSystems online programming contest dedicated to all things health-related will start very soon!

🏆 InterSystems FHIR and Digital Health Interoperability Contest 🏆

Duration: January 15 - February 4, 2024

Prize pool: $14,000

10 10
0 1.5K

We recently went through an Audit of our Security Policies and Procedures when it comes to IRIS. As a result of that Audit, we need to make adjustments to the way that Security is setup within IRIS. I have already done my changes on our TEST and DEVELOPMENT environments, but now I am trying to plan out how do we make these changes in Production.

These changes include moving away from the PWS, setting up Apache/Web Gateway, moving to LDAP instead of using Delegated Authentication, updating Web Applications, updating Resources, updating Services, etc...

1 4
0 144